/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/specification-jvb
ACT Appendix
1. Scope
This Specification contains the required modelling parameters for JV2 and JV3.
Intent
To prescribe how the modelling of the proposed and reference building is to be carried out under JV2 and JV3.
This…
Schedule of Products - Valves – General
/schedule-products-valves-general
Schedule of Products - Valves – General
Schedule of Products - Tapware
/schedule-products-tapware
Schedule of Products - Tapware
Schedule of Products - Fittings – Other
/schedule-products-fittings-other
Schedule of Products - Fittings – Other
/practitioners/information-industry-practitioners/dictionary-terms
Standards Australia and the Australian Building Codes Board produce an online dictionary of terms for the building and plumbing industry.
Schedule of Products - Fittings – Metallic
/schedule-products-fittings-metallic
Schedule of Products - Fittings – Metallic
Schedule of Products - Valves - Isolation
/schedule-products-valves-isolation
Schedule of Products - Valves - Isolation
/editions/2016/ncc-2016-volume-one/list-amendments/list-amendments-ncc-2016-volume-one
LIST OF AMENDMENTS - NCC 2016 - VOLUME ONE
This set of notes has been prepared by the Australian Building Codes Board to assist NCC users in identifying changes incorporated in the 2016 edition of Volume One.
The notes provide a description of…
/initiatives/prefabricated-modular-and-offsite-construction
Building Ministers have asked the Australian Building Codes Board (ABCB) to work with industry and governments to develop guidance that facilitates the increased use of prefabricated and modular construction technologies in Australia that are compliant…
/news/2020/one-exit-enough
If Deemed-to-Satisfy (DTS) Provision D1.4 can be satisfied by providing one exit, is that enough?
/ncc-navigator/gutter-and-downpipe-provisions-housing
This guide provides information for selecting and installing gutters and downpipes, including overflow measures for housing.
/news/2020/whats-word
The English language is ever-evolving, and new words and meanings are created all the time.
/editions/2019/ncc-2019-volume-one/schedule-5-fire-resistance-building-elements/schedule-5-fire
1. Scope
This Schedule sets out the procedures for determining the FRL of building elements.
2. Rating
A building element meets the requirements of this Schedule if—
(a)
it is listed in, and complies with Table 1 of this Schedule; or…
/editions/2019/ncc-2019-volume-two/schedule-5-fire-resistance-building-elements/schedule-5-fire
1. Scope
This Schedule sets out the procedures for determining the FRL of building elements.
2. Rating
A building element meets the requirements of this Schedule if—
(a)
it is listed in, and complies with Table 1 of this Schedule; or…
/editions/2019/ncc-2019-volume-three/schedule-5-fire-resistance-building-elements/schedule-5-fire
1. Scope
This Schedule sets out the procedures for determining the FRL of building elements.
2. Rating
A building element meets the requirements of this Schedule if—
(a)
it is listed in, and complies with Table 1 of this Schedule; or…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-5-fire-resistance-building-elements
1. Scope
This Schedule sets out the procedures for determining the FRL of building elements.
2. Rating
A building element meets the requirements of this Schedule if—
(a)
it is listed in, and complies with Table 1 of this Schedule; or…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-5-fire-resistance-building-elements
1. Scope
This Schedule sets out the procedures for determining the FRL of building elements.
2. Rating
A building element meets the requirements of this Schedule if—
(a)
it is listed in, and complies with Table 1 of this Schedule; or…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-5-fire-resistance-building-elements
1. Scope
This Schedule sets out the procedures for determining the FRL of building elements.
2. Rating
A building element meets the requirements of this Schedule if—
(a)
it is listed in, and complies with Table 1 of this Schedule; or…
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/specification-a23-fire-resistance
1. Scope
This Specification sets out the procedures for determining the FRL of building elements.
Deemed-to-Satisfy Provisions often require building elements to have an FRL. explains how these FRLs are to be determined and, in conjunction with…
/editions/2016/ncc-2016-volume-one/section-general-requirements/specification-a23-fire-resistance
1. Scope
This Specification sets out the procedures for determining the FRL of building elements.
Deemed-to-Satisfy Provisions often require building elements to have an FRL. explains how these FRLs are to be determined and, in conjunction with…