Skip to main content
  • ABCB
  • NCC Online
  • WaterMark
  • CodeMark

NCC 2022 online services are temporarily affected

We are working to fix some display issues with NCC 2022 online. You can still download each volume via the editions page. We apologise for any inconvenience. 

Home
  • Log in
  • Register
  • Reset password
Subscribe
  • Vol 1
  • Vol 2
  • Vol 3
  • NCC Editions
  • Propose a Change
  • Industry Practitioners
  • Resources
      1. Calculators
      2. Resource Library
      3. NCC CPD
      4. NCC Micromodules
      5. NCC Tutor
      6. NCC Tutor presentations for educators
      7. NCC Navigator
      8. Case Studies
  • Homeowners
      1. Common building features in homes
      2. Getting help with the National Construction Code
      3. How the NCC applies to your home
      4. What the NCC does and does not cover
  • Help & Support

Breadcrumb

  1. Home
  2. Search

Search results

SA Part G5 Construction in Bushfire Prone Areas
/editions/2016/ncc-2016-volume-one/south-australia/sa-part-g5-construction-bushfire-prone-areas
Delete G5.1 and insert SA G5.1: SA G5.1 Application of Part The Deemed-to-Satisfy Provisions of this Part apply to— (a) a Class 2 or 3 building; or (b) a Class 10a building or deck located within 6 m of an associated Class 2 or 3…
Section D Access and egress
/editions/2019/ncc-2019-volume-one/south-australia/section-d-access-and-egress
Vary D1.2(b) by adding SA D1.2(b)(iii) and (iv)as follows: SA D1.2 Number of exits required (b) Class 2 to 8 buildings—In addition to any horizontal exit, not less than 2 exits must be provided from the following: (iii) a storage shed in a…
Specification H1.3 Construction of Proscenium Walls
/editions/2016-a1/ncc-2016-volume-one/section-h-special-use-buildings/specification-h13-construction
1. Scope This Specification contains the requirements for the construction of proscenium walls for theatres, public halls, or the like. 2. Separation of stage areas, etc (a) Dressing rooms, scene docks, property rooms, workshops, associated…
Specification H1.3 Construction of Proscenium Walls
/editions/2016/ncc-2016-volume-one/section-h-special-use-buildings/specification-h13-construction
1. Scope This Specification contains the requirements for the construction of proscenium walls for theatres, public halls, or the like. 2. Separation of stage areas, etc (a) Dressing rooms, scene docks, property rooms, workshops, associated…
Specification E1.5a Class 2 and 3 buildings not more than 25 m in effective height
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e1.5a
1. Scope and application This Specification sets out requirements for the design and installation of fire sprinkler systems, and concessions for Class 2 and 3 buildings not more than 25 m in effective height with a rise in storeys of 4 or more. The…
Specification E1.5a Class 2 and 3 buildings not more than 25 m in effective height
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/specification-e15a-class-2-and-3
1. Scope and application This Specification sets out requirements for the design and installation of fire sprinkler systems, and concessions for Class 2 and 3 buildings not more than 25 m in effective height with a rise in storeys of 4 or more. The…
Part 3.7.4 Fire separation of garage top dwellings
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-37-fire-safety/part-374-fire-separation
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative fire separation design is proposed as a Performance Solution to that described in Part 3.7.4, that proposal must comply with—…
Part 3.7.4 Fire separation of garage top dwellings
/editions/2019/ncc-2019-volume-two/part-37-fire-safety/part-374-fire-separation-garage-top-dwellings
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative fire separation design is proposed as a Performance Solution to that described in Part 3.7.4, that proposal must comply with—…
Part F2 Sanitary and other facilities (DtS)
/editions/2019/ncc-2019-volume-one/section-f-health-and-amenity/part-f2-sanitary-and-other-dts
Deemed-to-Satisfy Provisions F2.0 Deemed-to-Satisfy Provisions Vic F2.0 (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements FP2.1 to FP2.6 are satisfied by complying with— (i) F2.1 to F2.9; and (…
Part F2 Sanitary and other facilities (DtS)
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-f-health-and-amenity/part-f2-sanitary-and-dts
Deemed-to-Satisfy Provisions F2.0 Deemed-to-Satisfy Provisions Vic F2.0 (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements FP2.1 to FP2.6 are satisfied by complying with— (i) F2.1 to F2.9; and (…
Part 3.2.5 Footing and slab construction
/editions/2019/ncc-2019-volume-two/part-32-footings-and-slabs/part-325-footing-and-slab-construction
Explanatory information: Explanatory information: The footings included in this Part reflect the requirements of AS 2870 and apply to the most common types of soil conditions. If the soil conditions on site are not covered by this Part then…
Part 3.2.5 Footing and slab construction
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-32-footings-and-slabs/part-325-footing-and
Explanatory information: Explanatory information: The footings included in this Part reflect the requirements of AS 2870 and apply to the most common types of soil conditions. If the soil conditions on site are not…
Part F2 Sanitary and Other Facilities (Deemed-to-Satisfy Provisions)
/editions/2016-a1/ncc-2016-volume-one/section-f-health-and-amenity/part-f2-sanitary-and-other
F2.0 Deemed-to-Satisfy Provisions Vic F2.0 (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with— (i) F2.1 to F2.8; and (ii) for public transport buildings, Part H2; and…
Part F2 Sanitary and Other Facilities (Deemed-to-Satisfy Provisions)
/editions/2016/ncc-2016-volume-one/section-f-health-and-amenity/part-f2-sanitary-and-other
F2.0 Deemed-to-Satisfy Provisions Vic F2.0 (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with— (i) F2.1 to F2.8; and (ii) for public transport buildings, Part H2; and…
PCD 2025 - Carpark fire safety improvements
/pcd/pcd-2025-carpark-fire-safety-improvements

These changes aim to address the fire-related risks associated with modern carparks, such as increased vehicle size, fuel load, new fuel sources and changes in the way we store vehicles. 

Part F1 Damp and Weatherproofing (Verification Methods)
/editions/2016-a1/ncc-2016-volume-one/section-f-health-and-amenity/part-f1-damp-and-weatherproofing
VERIFICATION METHODS FV1 Weatherproofing (a) Compliance with for weatherproofing of an external wall— that (i) has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table FV1.1; and (ii…
Part F1 Damp and Weatherproofing (Verification Methods)
/editions/2016/ncc-2016-volume-one/section-f-health-and-amenity/part-f1-damp-and-weatherproofing
VERIFICATION METHODS FV1 Weatherproofing (a) Compliance with for weatherproofing of an external wall— that (i) has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table FV1.1; and (ii…
Specification H1.3 Construction of proscenium walls
/editions/2019/ncc-2019-volume-one/section-h-special-use-buildings/specification-h13-construction
1. Scope This Specification contains the requirements for the construction of proscenium walls for theatres, public halls, or the like. Specification H1.3 —Comments This Guide does not address, in detail, every provision in this…
Specification H1.3 Construction of proscenium walls
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-h-special-use-buildings/specification-h13
1. Scope This Specification contains the requirements for the construction of proscenium walls for theatres, public halls, or the like. Specification H1.3 —Comments This Guide does not address, in detail, every provision in this…
Specification JVc Modelling profiles
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-jvc-modelling-profiles
1. Scope This Specification contains modelling profiles as referenced in subclause 3(c)(vii) of Specification JVb. Intent To prescribe the operation profiles that may be used in the modelling required by JV2 and JV3. 2. Modelling…

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • Page 10
  • Next page Next ›
  • Last page Last »

Areas of Interest

  • Performance (18)
  • Energy efficiency (16)
  • Plumbing and drainage (16)
  • Fire safety (15)
  • Health and amenity (14)
  • Building services (12)
  • Access and egress (11)
  • Structural safety (10)
  • Water services (10)
  • Product certification (9)
  • NCC compliance (3)
  • Governing Requirements (1)

Content type

  • Show all (912)
  • NCC Page (738)
  • Article (81)
  • Page (50)
  • Resource (20)
  • PCD (8)
  • NCC Navigator Page (6)
  • Video (5)
  • Events (2)
  • Page (CPD) (1)
  • (-) FAQ (1)

Domain

File type

Get the latest news and articles from the ABCB delivered straight to you. Subscribe to ABCB communications here

In the spirit of reconciliation the Australian Building Codes Board acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Home

Info

  • Copyright
  • Privacy
  • Disclaimer
  • Accessibility
  • Help & Support

Find us on:

  • Facebook
  • LinkedIn
  • Youtube