/editions/2019-a1/ncc-2019-volume-one-amendment-1/new-south-wales/section-c-fire-resistance
Part C1 Fire resistance and stability
Delete C1.10(a)(v), C1.10(b) and C1.10(c)(xiii) and insert NSW C1.10(a)(v), NSW C1.10(b) and NSW C1.10(c)(xiii) as
follows:
NSW C1.10 Fire hazard properties…
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/part-e4-visibility-emergency
EP4.1
To facilitate safe evacuation in an emergency, a building must be provided with a system that—
(a)
ensures a level of visibility sufficient to enable exits, paths of travel to exits and any obstacles along a path of travel to an exit to…
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/part-e4-visibility-emergency
EP4.1
To facilitate safe evacuation in an emergency, a building must be provided with a system that—
(a)
ensures a level of visibility sufficient to enable exits, paths of travel to exits and any obstacles along a path of travel to an exit to…
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine-areas
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-j15a-calculation-u
1. Scope
This specification describes the methods of calculating the U-Value and solar admittance of a wall-glazing construction.
Intent
This Specification describes the two calculation methods for determining if wall-glazing construction complies…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/specification-j15a
1. Scope
This specification describes the methods of calculating the U-Value and solar admittance of a wall-glazing construction.
Intent
This Specification describes the two calculation…
/ncc-navigator/thermal-bridging-commercial-buildings
This NCC Navigator provides an introduction to thermal bridging and how the NCC addresses it for commercial buildings in NCC Volume One. It explains how to account for thermal bridges when calculating the Total R-Value of certain construction types.…
/editions/2019/ncc-2019-volume-two/part-35-roof-and-wall-cladding/part-351-sheet-roofing
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative roof cladding is proposed as a Performance Solution to that described in Part 3.5.1, that proposal must comply with—
Performance…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-35-roof-and-wall-cladding/part-351-sheet
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative roof cladding is proposed as a…
/editions/2016-a1/ncc-2016-volume-one/new-south-wales/section-f-health-and-amenity
Part F2 Sanitary and Other Facilities
Delete FP2.6 (and Limitation) and replace with NSW FP2.6:
NSW FP2.6
(deleted).
Note
Note.
This Performance Requirement is deleted from the BCA in NSW, as the installation of hot water, warm water and…
/editions/2016/ncc-2016-volume-one/new-south-wales/section-f-health-and-amenity
Part F2 Sanitary and Other Facilities
Delete FP2.6 (and Limitation) and replace with NSW FP2.6:
NSW FP2.6
(deleted).
Note
Note.
This Performance Requirement is deleted from the BCA in NSW, as the installation of hot water, warm water and…
/editions/2019/ncc-2019-volume-one/new-south-wales/section-f-health-and-amenity
Part F2 Sanitary and Other Facilities
Delete FP2.6 (and Limitation) and replace with NSW FP2.6:
Performance Requirements
NSW FP2.6 Microbial control for water systems
(deleted).
Note
Note.
This Performance Requirement is deleted from the…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/new-south-wales/section-f-health-and-amenity
Part F2 Sanitary and Other Facilities
Delete FP2.6 (and Limitation) and replace with NSW FP2.6:
Performance Requirements
NSW FP2.6 Microbial control for water systems
(deleted).
Note
Note.
This Performance Requirement is deleted from the…
/resource/report/accessible-housing-estimated-cost-impact-proposed-changes-ncc
This updated report presents an order of cost estimate for the proposed changes to the National Construction Code of Australia (NCC) to include mandatory minimum accessible housing provisions for new Class 1a (single residential) and Class 2 (…
/editions/2016-a1/ncc-2016-volume-three/section-b-water-services/part-b1-cold-water-services-deemed
B1.1 Deemed-to-Satisfy Provisions
Performance RequirementsBP1.1 to BP1.3
are satisfied by complying with B1.2 to B1.6.
B1.2 General requirements
NSW B1.2(a)
Qld B1.2(a)
SA B1.2(a)
(a)
The design, construction,…
/editions/2016/ncc-2016-volume-three/section-b-water-services/part-b1-cold-water-services-deemed
B1.1 Deemed-to-Satisfy Provisions
Performance RequirementsBP1.1 to BP1.3
are satisfied by complying with B1.2 to B1.6.
B1.2 General requirements
NSW B1.2(a)
Qld B1.2(a)
SA B1.2(a)
(a)
The design, construction,…
/editions/2019/ncc-2019-volume-one/section-f-health-and-amenity/part-f3-room-heights
Performance Requirements
FP3.1 Room or space heights
A habitable room or space must have sufficient height that does not unduly interfere with its intended function.
The Objective of this Part is to safeguard occupants from injury or loss of…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-f-health-and-amenity/part-f3-room-heights
Performance Requirements
FP3.1 Room or space heights
A habitable room or space must have sufficient height that does not unduly interfere with its intended function.
The Objective of this Part is to safeguard occupants from injury or loss of…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/part-j3-building-sealing
J3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with—
(i)
J0.1 to J0.5; and
(ii)
J1.1 to J1.6; and
(iii)
J3.1 to J3.7; and…