/editions/2016/ncc-2016-volume-one/section-general-requirements/specification-a13-documents-adopted
1. Schedule of referenced documents
ACT, NSW, NT, QLD, SA, Tas, Vic Spec A1.3 Table 1
The Standards and other documents listed in Table 1 are referred to in Volume One of the BCA.
Table 1: SCHEDULE OF REFERENCED DOCUMENTS
No.
Date…
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/specification-a13-documents
1. Schedule of referenced documents
ACT, NSW, NT, QLD, SA, Tas, Vic Spec A1.3 Table 1
The Standards and other documents listed in Table 1 are referred to in Volume One of the BCA.
Table 1: SCHEDULE OF REFERENCED DOCUMENTS
No.
Date…
Report DCWC Cost implications study telecommunications
/resource/report/report-dcwc-cost-implications-study-telecommunications
The analysis is presented in a summary table for each building Class and type. The table details the costs associated with providing infrastructure for pathways and spaces for telecommunications cabling and equipment and has been calculated from first…
/editions/2016/ncc-2016-volume-two/section-1-general-requirements/part-14-documents-adopted
1.4.1 Schedule of referenced documents
The documents listed in Table 1.4.1 are referred to in the Housing Provisions.
Table 1.4.1: SCHEDULE OF REFERENCED DOCUMENTS
No
Date
Title
BCA Clause(s)
AS/NZS 1170
Structural design actions…
/editions/2016-a1/ncc-2016-volume-two/section-1-general-requirements/part-14-documents-adopted
1.4.1 Schedule of referenced documents
The documents listed in Table 1.4.1 are referred to in the Housing Provisions.
Table 1.4.1: SCHEDULE OF REFERENCED DOCUMENTS
No
Date
Title
BCA Clause(s)
AS/NZS 1170
Structural design actions…
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine-areas
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…
/editions/2016/ncc-2016-volume-one/section-b-structure/part-b1-structural-provisions-verification
VERIFICATION METHODS
BV1 Structural reliability
Compliance with and is verified for the design of structural components and connections when—
(a)
the calculated annual structural reliability index (β), for each action, is not less than that…
/editions/2016-a1/ncc-2016-volume-one/section-b-structure/part-b1-structural-provisions-verification
VERIFICATION METHODS
BV1 Structural reliability
Compliance with and is verified for the design of structural components and connections when—
(a)
the calculated annual structural reliability index (β), for each action, is not less than that…
/editions/2016/ncc-2016-volume-one/section-c-fire-resistance/part-c3-protection-openings
C3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
C1.1 to C1.13, C2.1 to C2.14andC3.1toC3.17; and
(ii)
in a building containing an…
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/part-c3-protection-openings
C3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14andC3.1toC3.17; and
(ii)
in a building containing an…
/news/2020/render-render-wall-can-i-put-render-them-all
The look and feel of rendered facades is familiar throughout Australia and new technologies have given rise to various synthetic renders, but have you considered if render is ever required by the Deemed-to-Satisfy (DTS) Provisions of the NCC to be non-…
/editions/2016/ncc-2016-volume-two/section-1-general-requirements/part-11-interpretation
1.1.1 Definitions
1.1.1.1
* * * * *
Note
This clause has deliberately been left blank.
1.1.1.2
In the Housing Provisions, unless the contrary appears:
Alpine area
means land—
likely to be subject to significant…
/editions/2016-a1/ncc-2016-volume-two/section-1-general-requirements/part-11-interpretation
1.1.1 Definitions
1.1.1.1
* * * * *
Note
This clause has deliberately been left blank.
1.1.1.2
In the Housing Provisions, unless the contrary appears:
Alpine area
means land—
likely to be subject to significant…
/editions/2019/ncc-2019-volume-one/tasmania/tas-part-h117-premises-lead-processing
Tas H117.1 Application of Part
This Part is applicable to every building in which lead processes are used.
Premises for lead processing must—
(a)
provide for the safety and comfort of workers; and
(b)
be constructed in a manner that…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/tasmania/tas-part-h117-premises-lead-processing
Tas H117.1 Application of Part
This Part is applicable to every building in which lead processes are used.
Premises for lead processing must—
(a)
provide for the safety and comfort of workers; and
(b)
be constructed in a manner that…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g4-construction-alpine-areas-dts
Deemed-to-Satisfy Provisions
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied by complying with—
(i)
G4.1 to G4.9; and
(ii)
for a…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g4-dts
Deemed-to-Satisfy Provisions
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy
Solution is proposed, Performance
Requirements GP4.1 to
GP4.4 are satisfied…
/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/part-j1-building-fabric
J1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements and are satisfied by complying with—
(i)
J0.1
to J0.3; and
(ii)
J1.1
to J1.6; and
(iii)
J2.1
to J2.5; and
(iv)…
/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/part-j1-building-fabric
J1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements and are satisfied by complying with—
(i)
J0.1
to J0.3; and
(ii)
J1.1
to J1.6; and
(iii)
J2.1
to J2.5; and
(iv)…