/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-j12-material-properties
1. Scope
This Specification lists the thermal properties of some common construction materials.
Intent
To clarify that Specification J1.2 covers the relevant properties attributed to common construction materials, air films and airspaces, and…
/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/specification-j12-material
1. Scope
This Specification lists the thermal properties of some common construction materials.
Intent
To clarify that covers the relevant properties attributed to common construction materials, air films and airspaces, and reflective…
/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/specification-j12-material-properties
1. Scope
This Specification lists the thermal properties of some common construction materials.
Intent
To clarify that covers the relevant properties attributed to common construction materials, air films and airspaces, and reflective…
/editions/2016-a1/ncc-2016-volume-one/section-f-health-and-amenity/part-f4-light-and-ventilation
F4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
F4.1
to F4.12; and
(ii)
for farm buildings and farm sheds, Part H3.
(b)…
/editions/2016/ncc-2016-volume-one/section-f-health-and-amenity/part-f4-light-and-ventilation-deemed
F4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
F4.1
to F4.12; and
(ii)
for farm buildings and farm sheds, Part H3.
(b)…
/ncc-navigator/thermal-bridging-commercial-buildings
This NCC Navigator provides an introduction to thermal bridging and how the NCC addresses it for commercial buildings in NCC Volume One. It explains how to account for thermal bridges when calculating the Total R-Value of certain construction types.…
/resource/calculator/ncc-2022-volume-two-gutters-downpipes-and-overflow-gdo-calculator
Assists in developing a better understanding of the NCC Volume Two ABCB Housing Provision Standard Gutters and Downpipes provisions.
To use the GDO Calculator enter information about the location, roof design and types of overflow measures. Based…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g6-occupiable
Note:
Note:
Part G6 contains Deemed-to-Satisfy Provisions additional to those contained in Section C, D, E, F and G for occupiable outdoor areas.
G6.1 Application of Part
(a)
The Deemed-to-Satisfy Provisions of this Part apply to…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g6-occupiable-outdoor-areas
Note:
Note:
Part G6 contains Deemed-to-Satisfy Provisions additional to those contained in Section C, D, E, F and G for occupiable outdoor areas.
G6.1 Application of Part
(a)
The Deemed-to-Satisfy Provisions of this Part apply to…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-35-roof-and-wall-cladding/part-351-sheet
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative roof cladding is proposed as a…
/editions/2019/ncc-2019-volume-two/part-35-roof-and-wall-cladding/part-351-sheet-roofing
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative roof cladding is proposed as a Performance Solution to that described in Part 3.5.1, that proposal must comply with—
Performance…
Temporary structures
/resource/standard/temporary-structures
This Standard provides technical design criteria requirements for temporary structures, covering structural safety (particularly determining appropriate wind actions), fire safety (including fire resistance of materials; fire safety services and…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/part-j1-building
J1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy
Solution is proposed, Performance
RequirementJP1 is
satisfied by complying with—
(i…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/part-j1-building-fabric
J1.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with—
(i)
J0.1 to J0.5; and
(ii)
J1.1 to J1.6; and
(iii)
J3.1 to J3.7; and…
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/specification-a13-documents
1. Schedule of referenced documents
ACT, NSW, NT, QLD, SA, Tas, Vic Spec A1.3 Table 1
The Standards and other documents listed in Table 1 are referred to in Volume One of the BCA.
Table 1: SCHEDULE OF REFERENCED DOCUMENTS
No.
Date…
/editions/2016/ncc-2016-volume-one/section-general-requirements/specification-a13-documents-adopted
1. Schedule of referenced documents
ACT, NSW, NT, QLD, SA, Tas, Vic Spec A1.3 Table 1
The Standards and other documents listed in Table 1 are referred to in Volume One of the BCA.
Table 1: SCHEDULE OF REFERENCED DOCUMENTS
No.
Date…
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/part-c2-compartmentation-and
C2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14andC3.1toC3.17; and
(ii)
in a building containing an…
/editions/2016/ncc-2016-volume-one/section-c-fire-resistance/part-c2-compartmentation-and-separation
C2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
C1.1 to C1.13, C2.1 to C2.14andC3.1toC3.17; and
(ii)
in a building containing an…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/part-c2-compartmentation
C2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsCP1 to CP9 are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14 and C3.1 to C3.17; and
(ii)
in a building…
/editions/2019/ncc-2019-volume-one/section-c-fire-resistance/part-c2-compartmentation-and-separation
C2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsCP1 to CP9 are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14 and C3.1 to C3.17; and
(ii)
in a building…