ABCB Board member profile: Rolph Vos
/news/2019/abcb-board-member-profile-rolph-vos
Connect regularly features the profile of a member of the ABCB Board. This issue introduces Rolph Vos, Australian Local Government Board member and talks about his role on the Board, emerging issues and challenges working within the industry.
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/part-a3-classification-buildings
A3.1 Principles of classification
The classification of a building or part of a building is determined by the purpose for which it is designed, constructed or adapted to be used.
Intent
To state the basis of any decision regarding the…
/editions/2016/ncc-2016-volume-one/section-general-requirements/part-a3-classification-buildings-and
A3.1 Principles of classification
The classification of a building or part of a building is determined by the purpose for which it is designed, constructed or adapted to be used.
Intent
To state the basis of any decision regarding the…
/editions/2016/ncc-2016-volume-two/section-2-performance-provisions/part-25-safe-movement-and-access
VERIFICATION METHODS
V2.5.1 Wire barriers
Compliance with P2.5.2(f) and (g) for wire barriers is verified when the wire barrier passes the test described below:
(a)
Application
The test must be carried out on either—
(i)
a prototype of…
/editions/2016-a1/ncc-2016-volume-two/section-2-performance-provisions/part-25-safe-movement-and
VERIFICATION METHODS
V2.5.1 Wire barriers
Compliance with P2.5.2(f) and (g) for wire barriers is verified when the wire barrier passes the test described below:
(a)
Application
The test must be carried out on either—
(i)
a prototype of…
/news/2025/update-progress-next-edition-ncc
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/specification-jvb
ACT Appendix
1. Scope
This Specification contains the required modelling parameters for JV2 and JV3.
Intent
To prescribe how the modelling of the proposed and reference building is to be carried out under JV2 and JV3.
This…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-jvb-modelling
ACT Appendix
1. Scope
This Specification contains the required modelling parameters for JV2 and JV3.
Intent
To prescribe how the modelling of the proposed and reference building is to be carried out under JV2 and JV3.
This…
/editions/2016/ncc-2016-volume-one/section-d-access-and-egress/section-d-access-and-egress
VERIFICATION METHODS
DV1 Wire barriers
Compliance with DP3(f) and (g) for wire barriers is verified when the wire barrier passes the test described below:
(a)
Application
The test must be carried out on either—
(i)
a prototype of a wire…
/editions/2016-a1/ncc-2016-volume-one/section-d-access-and-egress/section-d-access-and-egress
VERIFICATION METHODS
DV1 Wire barriers
Compliance with DP3(f) and (g) for wire barriers is verified when the wire barrier passes the test described below:
(a)
Application
The test must be carried out on either—
(i)
a prototype of a wire…
/news/2020/allowable-encroachments-how-close-too-close
Did you know that NCC Volume Two contains requirements relevant to plumbers, gas-fitters and air-conditioning installers?
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-7-fire-safety-verification-method/11
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance Requirements of NCC Volume One set out in Table 1.1…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-7-fire-safety-verification-method/11
1.1 Purpose
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance Requirements of NCC Volume One set out…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/11
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance Requirements of NCC Volume One set out in Table 1.1…
/editions/2019/ncc-2019-volume-one/schedule-7-fire-safety-verification-method/11-purpose
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance Requirements of NCC Volume One set out in Table 1.1…
/editions/2019/ncc-2019-volume-two/schedule-7-fire-safety-verification-method/11-purpose
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance Requirements of NCC Volume One set out in Table 1.1…
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/11-purpose
1.1 Purpose
This Verification Method presents specific design scenarios that must be considered in order to demonstrate that the fire safety aspects of a building design comply with the fire safety Performance Requirements of NCC Volume One set out…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-310-ancillary-provisions-and-additional/p3.10.6
Explanatory information:
Appropriate
Performance Requirements
Where an alternative method for attaching a…
/editions/2019/ncc-2019-volume-two/part-310-ancillary-provisions-and-additional-construction/part
Explanatory information:
Appropriate
Performance Requirements
Where an alternative method for attaching a deck or balcony to an external wall is proposed as a Performance Solution to that described in Part 3.10.6, that proposal…
/editions/2016/ncc-2016-volume-one/section-c-fire-resistance/specification-c315-penetration-walls
1. Scope
This Specification prescribes materials and methods of installation for services that penetrate walls, floors and ceilings required to have an FRL.
2. Application
(a)
This Specification applies to installations permitted under…