/editions/2016/ncc-2016-volume-one/section-general-requirements/part-a2-acceptance-design-and
A2.1 Suitability of materials
Every part of a building must be constructed in an appropriate manner to achieve the requirements of the BCA, using materials and construction being fit for the purpose for which they are intended including the provision…
ABCB data resources
/abcb-data-resources
As part of our work to support practitioners in understanding and using the code, the ABCB has published some datasets to data.gov.au the central source of Australian open government data.
/editions/2016-a1/ncc-2016-volume-one/introduction/copyright-and-licence-notice
© 2016 Commonwealth of Australia and States and Territories of Australia
Ownership of intellectual property rights
Unless otherwise noted, copyright (and any other intellectual property rights, if any) in this publication is jointly…
/editions/2016/ncc-2016-volume-one/introduction/copyright-and-licence-notice
© 2016 Commonwealth of Australia and States and Territories of Australia
Ownership of intellectual property rights
Unless otherwise noted, copyright (and any other intellectual property rights, if any) in this publication is jointly…
/editions/2019/ncc-2019-volume-one/schedule-7-fire-safety-verification-method/211-design-scenario-rc
Robustness check
Design scenario in brief
The fire design will be checked to ensure that the failure of a critical part of the fire safety system will not result in the design not meeting the Performance Requirements.
Required outcome…
/editions/2019/ncc-2019-volume-two/schedule-7-fire-safety-verification-method/211-design-scenario-rc
Robustness check
Design scenario in brief
The fire design will be checked to ensure that the failure of a critical part of the fire safety system will not result in the design not meeting the Performance Requirements.
Required outcome…
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/211-design-scenario
Robustness check
Design scenario in brief
The fire design will be checked to ensure that the failure of a critical part of the fire safety system will not result in the design not meeting the Performance Requirements.
Required outcome…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/211
Robustness check
Design scenario in brief
The fire design will be checked to ensure that the failure of a critical part of the fire safety system will not result in the design not meeting the Performance Requirements.
Required outcome…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-7-fire-safety-verification-method/211
Robustness check
Design scenario in brief
The fire design will be checked to ensure that the failure of a critical part of the fire safety system will not result in the design not meeting the Performance Requirements.
Required outcome…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-7-fire-safety-verification-method/211
Robustness check
Design scenario in brief
The fire design will be checked to ensure that the failure of a critical part of the fire safety system will not result in the design not meeting the Performance Requirements.
Required outcome…
/news/2019/construction-sanitary-compartments
The NCC contains a Performance Requirement that requires a sanitary compartment to be constructed with sufficient space or other means to permit an unconscious occupant to be removed from the compartment. The corresponding Deemed-to-Satisfy Provisions…
/editions/2016-a1/ncc-2016-volume-two/section-1-general-requirements/part-12-acceptance-design-and
1.2.1 Suitability of materials
Every part of a building must be constructed in an appropriate manner to achieve the requirements of the Housing Provisions, using materials that are fit for the purpose for which they are intended.
1.2.2 Evidence…
/editions/2016/ncc-2016-volume-two/section-1-general-requirements/part-12-acceptance-design-and
1.2.1 Suitability of materials
Every part of a building must be constructed in an appropriate manner to achieve the requirements of the Housing Provisions, using materials that are fit for the purpose for which they are intended.
1.2.2 Evidence…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-jvb-modelling
ACT Appendix
1. Scope
This Specification contains the required modelling parameters for JV2 and JV3.
Intent
To prescribe how the modelling of the proposed and reference building is to be carried out under JV2 and JV3.
This…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/specification-jvb
ACT Appendix
1. Scope
This Specification contains the required modelling parameters for JV2 and JV3.
Intent
To prescribe how the modelling of the proposed and reference building is to be carried out under JV2 and JV3.
This…
/editions/2019/ncc-2019-volume-two/section-1-governing-requirements/part-a5-documentation-design-and
Introduction to this Part
This Part explains the evidence needed to show that the NCC requirements are met and the solution is "fit for purpose". It covers the use of materials, products, forms of construction and designs. It details separate…
/editions/2019/ncc-2019-volume-three/section-governing-requirements/part-a5-documentation-design-and
Introduction to this Part
This Part explains the evidence needed to show that the NCC requirements are met and the solution is "fit for purpose". It covers the use of materials, products, forms of construction and designs. It details separate…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-governing-requirements/part-a5
Introduction to this Part
This Part explains the evidence needed to show that the NCC requirements are met and the solution is "fit for purpose". It covers the use of materials, products, forms of construction and designs. It details…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/section-1-governing-requirements/part-a5
Introduction to this Part
This Part explains the evidence needed to show that the NCC requirements are met and the solution is "fit for purpose". It covers the use of materials, products, forms of construction and designs. It details…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/section-governing-requirements/part-a5
Introduction to this Part
This Part explains the evidence needed to show that the NCC requirements are met and the solution is "fit for purpose". It covers the use of materials, products, forms of construction and designs. It details…