/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/part-c3-protection
C3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsCP1 to CP9 are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14 and C3.1 to C3.17; and
(ii)
in a building…
/editions/2019/ncc-2019-volume-one/section-c-fire-resistance/part-c3-protection-openings
C3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsCP1 to CP9 are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14 and C3.1 to C3.17; and
(ii)
in a building…
/editions/2019/ncc-2019-volume-one/tasmania/section-g-ancillary-provisions
Part G1 Minor structures and components
Tas GP1.2 Swimming pool access and water recirculation systems
(a)
A barrier must be provided to a swimming pool and must—
(i)
be continuous for the full extent of the hazard; and
(ii…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/tasmania/section-g-ancillary-provisions
Part G1 Minor structures and components
Tas GP1.2 Swimming pool access and water recirculation systems
(a)
A barrier must be provided to a swimming pool and must—
(i)
be continuous for the full extent of the hazard; and
(ii…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-jva-additional
ACT Appendix
1. Scope
This Specification contains requirements that must be complied with in addition to the modelling requirements of JV1, JV2 and JV3.
Intent
To clarify that there are additional requirements to the modelling…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/specification-jva
ACT Appendix
1. Scope
This Specification contains requirements that must be complied with in addition to the modelling requirements of JV1, JV2 and JV3.
Intent
To clarify that there are additional requirements to the modelling…
/news/2020/ncc-2022-new-sptc-referencing-system
Here’s what to expect with the code’s new referencing system, dubbed SPTC: ‘Section - Part - Type - Clause’.
/editions/2016/ncc-2016-volume-one/new-south-wales/nsw-part-h101-entertainment-venues-other
Note
Note
NSW Part H101 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E, F and G for buildings containing or used as entertainment venues other than temporary structures and drive-in theatres.…
/editions/2016-a1/ncc-2016-volume-one/new-south-wales/nsw-part-h101-entertainment-venues-other
Note
Note
NSW Part H101 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E, F and G for buildings containing or used as entertainment venues other than temporary structures and drive-in theatres.…
/editions/2019/ncc-2019-volume-one/new-south-wales/nsw-part-h101-entertainment-venues-other
Note
Note
NSW Part H101 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E, F and G for buildings containing or used as entertainment venue other than temporary structures and drive-in theatres.…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-jvb-modelling
ACT Appendix
1. Scope
This Specification contains the required modelling parameters for JV2 and JV3.
Intent
To prescribe how the modelling of the proposed and reference building is to be carried out under JV2 and JV3.
This…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/specification-jvb
ACT Appendix
1. Scope
This Specification contains the required modelling parameters for JV2 and JV3.
Intent
To prescribe how the modelling of the proposed and reference building is to be carried out under JV2 and JV3.
This…
/editions/2019/ncc-2019-volume-one/schedule-7-fire-safety-verification-method/27-design-scenario
Rapid fire spread involving internal surface linings
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the level of safety be at least…
/editions/2019/ncc-2019-volume-two/schedule-7-fire-safety-verification-method/27-design-scenario
Rapid fire spread involving internal surface linings
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the level of safety be at least…
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/27-design-scenario
Rapid fire spread involving internal surface linings
Design scenario in brief
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/27
Rapid fire spread involving internal surface linings
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the level of safety be at least…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-7-fire-safety-verification-method/27
Rapid fire spread involving internal surface linings
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the level of safety be at least…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-7-fire-safety-verification-method/27
Rapid fire spread involving internal surface linings
Design scenario in brief
Design scenario in brief
Interior surfaces are exposed to a growing fire that potentially endangers building occupants.
Required outcome
Demonstrate that the…
/editions/2019/ncc-2019-volume-one/tasmania/tas-part-h117-premises-lead-processing
Tas H117.1 Application of Part
This Part is applicable to every building in which lead processes are used.
Premises for lead processing must—
(a)
provide for the safety and comfort of workers; and
(b)
be constructed in a manner that…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/tasmania/tas-part-h117-premises-lead-processing
Tas H117.1 Application of Part
This Part is applicable to every building in which lead processes are used.
Premises for lead processing must—
(a)
provide for the safety and comfort of workers; and
(b)
be constructed in a manner that…