/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-4-referenced-documents/schedule-4
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-4-list-reference-documents/schedule-4
Schedule of referenced documents
The Standards and other documents listed in Schedule 4 are referred to in the NCC.
Table 1 Schedule of referenced documents
No.
Date
Title
Volume One
Volume Two…
/pcd/pcd-2025-commercial-building-energy-efficiency
These changes aim to reduce emissions, providing cost-effective fuel and technology neutral ways for buildings to move to a net zero future.
/editions/2016-a1/ncc-2016-volume-one/section-d-access-and-egress/part-d2-construction-exits
D2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1
to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and
(ii)
in a…
/editions/2016/ncc-2016-volume-one/section-d-access-and-egress/part-d2-construction-exits
D2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1
to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and
(ii)
in a…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-d-access-and-egress/part-d2-construction
D2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1 to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and
(ii)…
/editions/2019/ncc-2019-volume-one/section-d-access-and-egress/part-d2-construction-exits
D2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1 to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and
(ii)…
/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/part-j2-glazing
J2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsJP1 and JP3 are satisfied by complying with—
(i)
J0.1
to J0.3; and
(ii)
J1.1
to J1.6; and
(iii)
J2.1
to J2.5; and…
/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/part-j2-glazing
J2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsJP1 and JP3 are satisfied by complying with—
(i)
J0.1
to J0.3; and
(ii)
J1.1
to J1.6; and
(iii)
J2.1
to J2.5; and…