Skip to main content
  • ABCB
  • NCC Online
  • WaterMark
  • CodeMark
Home
  • Log in
  • Register
  • Reset password
Subscribe
  • Vol 1
  • Vol 2
  • Vol 3
  • HP
  • Commercial providers
  • NCC Editions
  • Propose a Change
  • Industry Practitioners
  • Resources
      1. Calculators
      2. Resource Library
      3. NCC CPD
      4. NCC Micromodules
      5. NCC Tutor
      6. NCC Tutor presentations for educators
      7. NCC Navigator
      8. Case Studies
  • General User
      1. What you need to know
      2. Project Planning
      3. Getting help with the code
      4. History
  • Help & Support

Breadcrumb

  1. Home
  2. Search

Search results

Part J6 Artificial lighting and power
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/part-j6-artificial
J6.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with— (i) J0.1 to…
Part J6 Artificial lighting and power
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/part-j6-artificial-lighting-and-power
J6.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with— (i) J0.1 to J0.5; and (ii) J1.1 to J1.6; and (iii) J3.1 to J3.7; and…
Demonstrating NCC compliance using AS 5113
/news/2020/demonstrating-ncc-compliance-using-5113

AS 5113:2016 Classification of external walls of buildings based on reaction to fire performance (AS 5113) is a standard that sets out procedures and criteria for classifying external walls of buildings.

Part 3.8.6 Sound insulation
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-38-health-and-amenity/part-386-sound
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative sound…
Part 3.8.6 Sound insulation
/editions/2019/ncc-2019-volume-two/part-38-health-and-amenity/part-386-sound-insulation
Appropriate Performance Requirements Appropriate Performance Requirements Where an alternative sound insulation system is proposed as a Performance Solution to that described in Part 3.8.6, that proposal must comply with—…
Specification A1.1 Fire-Protected Timber
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/specification-a11-fire-protected
1. Scope This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded. Intent To set out the requirements…
Specification A1.1 Fire-Protected Timber
/editions/2016/ncc-2016-volume-one/section-general-requirements/specification-a11-fire-protected
1. Scope This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded. Intent To set out the requirements…
Part H3 Farm Buildings And Farm Sheds
/editions/2016-a1/ncc-2016-volume-one/section-h-special-use-buildings/part-h3-farm-buildings-and
Note Note. Part H3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D,E and F for farm buildings and farm sheds. H3.1 Application of Part (a) The Deemed-to-Satisfy Provisions of this Part apply…
Part H3 Farm Buildings And Farm Sheds
/editions/2016/ncc-2016-volume-one/section-h-special-use-buildings/part-h3-farm-buildings-and-farm
Note Note. Part H3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D,E and F for farm buildings and farm sheds. H3.1 Application of Part (a) The Deemed-to-Satisfy Provisions of this Part apply…
Part J1 Building fabric
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/part-j1-building
J1.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with— (i…
Part J1 Building fabric
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/part-j1-building-fabric
J1.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with— (i) J0.1 to J0.5; and (ii) J1.1 to J1.6; and (iii) J3.1 to J3.7; and…
Specification C1.13a Fire-protected timber
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/specification-c113a-fire
1. Scope This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded…
Specification C1.13a Fire-protected timber
/editions/2019/ncc-2019-volume-one/section-c-fire-resistance/specification-c113a-fire-protected
1. Scope This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded. 2. Requirements 2.1…
Specification C1.10 Fire hazard properties
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/specification-c110-fire
1. Scope This Specification sets out requirements in relation to the fire hazard properties of linings, materials and assemblies in Class 2 to 9 buildings as set out in Table 1. Intent To set out the scope of Specification C1.10. It should…
Specification C1.10 Fire hazard properties
/editions/2019/ncc-2019-volume-one/section-c-fire-resistance/specification-c110-fire-hazard
1. Scope This Specification sets out requirements in relation to the fire hazard properties of linings, materials and assemblies in Class 2 to 9 buildings as set out in Table 1. Intent To set out the scope of Specification C1.10. It should…
Part G4 Construction in alpine areas (DtS)
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g4-dts
Deemed-to-Satisfy Provisions G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied…
Part G4 Construction in alpine areas (DtS)
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g4-construction-alpine-areas-dts
Deemed-to-Satisfy Provisions G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied by complying with— (i) G4.1 to G4.9; and (ii) for a…
Part 3.12.2 External glazing
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-312-energy-efficiency/part-3122-external
3.12.2 Application This Part applies to— (a) a Class 1 building; and (b) a Class 10a building with a conditioned space. Energy Efficiency NCC Volume Two 3.12.2.1 External glazing (a) The aggregate conductance…
Part 3.12.2 External glazing
/editions/2019/ncc-2019-volume-two/part-312-energy-efficiency/part-3122-external-glazing
3.12.2 Application This Part applies to— (a) a Class 1 building; and (b) a Class 10a building with a conditioned space. Energy Efficiency NCC Volume Two 3.12.2.1 External glazing (a) The aggregate conductance…
Modernising the National Construction Code
/news/2026/modernising-national-construction-code

Help shape the future of the National Construction Code (NCC). The discussion paper is now open for public consultation.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • …
  • Next page Next ›
  • Last page Last »

Areas of Interest

  • Performance (12)
  • Plumbing and drainage (10)
  • Fire safety (9)
  • Energy efficiency (8)
  • Building services (6)
  • Health and amenity (6)
  • Structural safety (6)
  • Access and egress (5)
  • Water services (5)
  • NCC compliance (4)
  • Product certification (4)
  • Governing Requirements (1)

Content type

  • NCC Page (691)
  • Article (56)
  • Page (43)
  • Resource (20)
  • PCD (8)
  • NCC Navigator Page (7)
  • Video (2)
  • Page (CPD) (1)

Domain

File type

Get the latest news and articles from the ABCB delivered straight to you. Subscribe to ABCB communications here

In the spirit of reconciliation the Australian Building Codes Board acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Home

Info

  • Copyright
  • Privacy
  • Disclaimer
  • Accessibility
  • Help & Support

Find us on:

  • Facebook
  • LinkedIn
  • Youtube