/editions/2016/ncc-2016-volume-two/part-312-energy-efficiency/part-3122-external-glazing
3.12.2 Application
This Part applies to—
(a)
a Class 1 building; and
(b)
a Class 10a building with a conditioned space.
3.12.2.1 External glazing
(a)
The aggregate conductance of the glazing in each storey, including any…
/editions/2016-a1/ncc-2016-volume-two/part-312-energy-efficiency/part-3122-external-glazing
3.12.2 Application
This Part applies to—
(a)
a Class 1 building; and
(b)
a Class 10a building with a conditioned space.
3.12.2.1 External glazing
(a)
The aggregate conductance of the glazing in each storey, including any…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-governing-requirements/part-a5
Introduction to this Part
This Part explains the evidence needed to show that the NCC requirements are met and the solution is "fit for purpose". It covers the use of materials, products, forms of construction and designs. It details…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/section-1-governing-requirements/part-a5
Introduction to this Part
This Part explains the evidence needed to show that the NCC requirements are met and the solution is "fit for purpose". It covers the use of materials, products, forms of construction and designs. It details…
/editions/2019/ncc-2019-volume-two/section-1-governing-requirements/part-a5-documentation-design-and
Introduction to this Part
This Part explains the evidence needed to show that the NCC requirements are met and the solution is "fit for purpose". It covers the use of materials, products, forms of construction and designs. It details separate…
/editions/2019/ncc-2019-volume-three/section-governing-requirements/part-a5-documentation-design-and
Introduction to this Part
This Part explains the evidence needed to show that the NCC requirements are met and the solution is "fit for purpose". It covers the use of materials, products, forms of construction and designs. It details separate…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/section-governing-requirements/part-a5
Introduction to this Part
This Part explains the evidence needed to show that the NCC requirements are met and the solution is "fit for purpose". It covers the use of materials, products, forms of construction and designs. It details…
/editions/2019/ncc-2019-volume-one/section-governing-requirements/part-a5-documentation-design-and
Introduction to this Part
This Part explains the evidence needed to show that the NCC requirements are met and the solution is "fit for purpose". It covers the use of materials, products, forms of construction and designs. It details separate…
/editions/2016-a1/ncc-2016-volume-one/section-d-access-and-egress/part-d3-access-people-disability
D3.0 Deemed-to-Satisfy Provisions
Tas D3.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1 to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and…
/editions/2016/ncc-2016-volume-one/section-d-access-and-egress/part-d3-access-people-disability
D3.0 Deemed-to-Satisfy Provisions
Tas D3.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsDP1 to DP6, DP8 and DP9 are satisfied by complying with—
(i)
D1.1 to D1.16, D2.1 to D2.25 and D3.1 to D3.12; and…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-312-energy-efficiency/part-3122-external
3.12.2 Application
This Part applies to—
(a)
a Class 1 building; and
(b)
a Class 10a building with a conditioned space.
Energy Efficiency NCC Volume Two
3.12.2.1 External glazing
(a)
The aggregate conductance…
/editions/2019/ncc-2019-volume-two/part-312-energy-efficiency/part-3122-external-glazing
3.12.2 Application
This Part applies to—
(a)
a Class 1 building; and
(b)
a Class 10a building with a conditioned space.
Energy Efficiency NCC Volume Two
3.12.2.1 External glazing
(a)
The aggregate conductance…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/part-j7-heated-water
J7.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirement JP1 is satisfied by complying with—
(i)
J0.1 to J0.5; and
(ii)
J1.1 to J1.6; and
(iii)
J3.1 to J3.7; and…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/part-j7-heated-water-supply-and
J7.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirement JP1 is satisfied by complying with—
(i)
J0.1 to J0.5; and
(ii)
J1.1 to J1.6; and
(iii)
J3.1 to J3.7; and…
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/specification-c315-penetration-walls
1. Scope
This Specification prescribes materials and methods of installation for services that penetrate walls, floors and ceilings required to have an FRL.
2. Application
(a)
This Specification applies to installations permitted under…
/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/specification-j52d-space-heating
1. Scope
This Specification contains the requirements for heaters used for air-conditioning or as part of an air-conditioning system.
Intent
To clarify that provides the requirements for stand-alone heaters used for air-conditioning, as well…
/editions/2016/ncc-2016-volume-one/section-c-fire-resistance/specification-c315-penetration-walls
1. Scope
This Specification prescribes materials and methods of installation for services that penetrate walls, floors and ceilings required to have an FRL.
2. Application
(a)
This Specification applies to installations permitted under…
/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/specification-j52d-space-heating
1. Scope
This Specification contains the requirements for heaters used for air-conditioning or as part of an air-conditioning system.
Intent
To clarify that provides the requirements for stand-alone heaters used for air-conditioning, as well…
/editions/2019/ncc-2019-volume-three/northern-territory/section-d-excessive-noise
Part D1 Excessive noise
Performance Requirements
Delete Note 1 and Note 2 and insert NT Note 1 and NT Note 2 as follows:
NT DP1.2 Excessive noise
NT Note 1:
NT Note 1:
NT Note 1:
Part F5 in the NT Appendix in Volume One of the…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/northern-territory/section-d-excessive-noise
Part D1 Excessive noise
Performance Requirements
Delete Note 1 and Note 2 and insert NT Note 1 and NT Note 2 as follows:
NT DP1.2 Excessive noise
NT Note 1:
NT Note 1:
NT Note 1:
Part F5 in the NT Appendix in Volume One of the…