/editions/2019/ncc-2019-volume-one/schedule-7-fire-safety-verification-method/15-fire-modelling
For particular design scenarios, the designer must demonstrate that the occupants have sufficient time to evacuate the building before being overcome by the effects of fire.
In fire safety engineering terms, the ASET must be greater than the RSET…
/editions/2019/ncc-2019-volume-two/schedule-7-fire-safety-verification-method/15-fire-modelling
For particular design scenarios, the designer must demonstrate that the occupants have sufficient time to evacuate the building before being overcome by the effects of fire.
In fire safety engineering terms, the ASET must be greater than the RSET…
/editions/2019/ncc-2019-volume-three/schedule-7-fire-safety-verification-method/15-fire-modelling
For particular design scenarios, the designer must demonstrate that the occupants have sufficient time to evacuate the building before being overcome by the effects of fire.
In fire safety engineering terms, the ASET must be greater than the RSET…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/schedule-7-fire-safety-verification-method/15-fire
For particular design scenarios, the designer must demonstrate that the occupants have sufficient time to evacuate the building before being overcome by the effects of fire.
In fire safety engineering terms, the ASET must be greater than the RSET…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/schedule-7-fire-safety-verification-method/15-fire
For particular design scenarios, the designer must demonstrate that the occupants have sufficient time to evacuate the building before being overcome by the effects of fire.
In fire safety engineering terms, the ASET must be greater than the RSET…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/schedule-7-fire-safety-verification-method/15
For particular design scenarios, the designer must demonstrate that the occupants have sufficient time to evacuate the building before being overcome by the effects of fire.
In fire safety engineering terms, the ASET must be greater than the RSET…
/editions/2019/ncc-2019-volume-one/western-australia/wa-part-h101-public-buildings
Note:
Note:
WA Part H101 contains Deemed-to-Satisfy Solutions for WA public buildings that are additional to those contained in Sections D, F and H.
WA H101.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is…
/editions/ncc-2022/adopted/volume-one/11-western-australia/wa-footnote-other-legislation-affecting-buildings
In addition to any applicable provisions of the Building Act 2011, Building Regulations 2012 and this Code, there…
/editions/ncc-2022/adopted/volume-two/11-western-australia/wa-footnote-other-legislation-affecting-buildings
In addition to any applicable provisions of the Building Act 2011, Building Regulations 2012 and this Code, there…
/editions/ncc-2022/adopted/volume-three/11-western-australia/wa-footnote-other-legislation-affecting-buildings
In addition to any applicable provisions of the Plumbers Licensing Act 1995, Plumbers Licensing and Plumbing…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/western-australia/wa-part-h101-public-buildings
Note:
Note:
WA Part H101 contains Deemed-to-Satisfy Solutions for WA public buildings that are additional to those contained in Sections D, F and H.
WA H101.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is…
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/specification-e15-fire-sprinkler
1. Scope
This Specification sets out requirements for the design and installation of fire sprinkler systems.
Intent
To state that gives the design and installation details for sprinkler systems required by the Deemed-to-Satisfy Provisions…
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/specification-e15-fire
1. Scope
This Specification sets out requirements for the design and installation of fire sprinkler systems.
Intent
To state that gives the design and installation details for sprinkler systems required by the Deemed-to-Satisfy Provisions…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/specification-e15
1. Scope
This Specification sets out requirements for the design and installation of fire sprinkler systems.
Intent
To state that Specification E1.5 gives the design and installation details for sprinkler systems required by the Deemed-to-…
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/specification-e15-fire-sprinkler
1. Scope
This Specification sets out requirements for the design and installation of fire sprinkler systems.
Intent
To state that Specification E1.5 gives the design and installation details for sprinkler systems required by the Deemed-to-…
/editions/ncc-2022/adopted/volume-one/11-western-australia/b2-changes-asnzs-117022021
Introduction to this Part
This Part sets out the changes necessary to the application of AS/NZS 1170.2:2021 in…
/editions/ncc-2022/adopted/volume-one/b-structure/wa-part-b2-changes-asnzs-117022021
Introduction to this Part
This Part sets out the changes necessary to the application of AS/NZS 1170.2:2021 in…
/editions/ncc-2022/adopted/volume-one/9-tasmania/i15-premises-lead-processing
Introduction to this Part
This Part contains additional requirements for premises used for lead processing…
/editions/ncc-2022/adopted/volume-one/i-special-use-buildings/tas-part-i15-premises-lead-processing
Introduction to this Part
This Part contains additional requirements for premises used for lead processing…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/specification-j15a-calculation-u
1. Scope
This specification describes the methods of calculating the U-Value and solar admittance of a wall-glazing construction.
Intent
This Specification describes the two calculation methods for determining if wall-glazing construction complies…