What is WaterMark?
/plumbers/what-watermark
The National Construction Code (NCC) requires any plumbing or drainage product of a type listed on the WaterMark Schedule of Products, to be WaterMark certified. It must be certified and installed by a licensed plumbing practitioner.
/editions/2016-a1/ncc-2016-volume-two/part-34-framing/part-342-steel-framing
Appropriate Performance Requirements
Appropriate Performance Requirements
Where an alternative steel framing system is proposed as a Performance Solution to that described in Part 3.4.2, that proposal must comply with—
; and
the relevant…
/editions/2016/ncc-2016-volume-two/part-34-framing/part-342-steel-framing
Appropriate Performance Requirements
Appropriate Performance Requirements
Where an alternative steel framing system is proposed as a Performance Solution to that described in Part 3.4.2, that proposal must comply with—
; and
the relevant…
/editions/2016-a1/ncc-2016-volume-two/part-38-health-and-amenity/part-386-sound-insulation
Appropriate Performance Requirements
Appropriate
Performance Requirements:
Where an alternative sound insulation system is proposed as a Performance Solution to that described in Part 3.8.6, that proposal must comply with—
P2.4.6; and…
/editions/2016/ncc-2016-volume-two/part-38-health-and-amenity/part-386-sound-insulation
Appropriate Performance Requirements
Appropriate
Performance Requirements:
Where an alternative sound insulation system is proposed as a Performance Solution to that described in Part 3.8.6, that proposal must comply with—
P2.4.6; and…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/south-australia/section-d-access-and-egress
Vary D1.2(b) by adding SA D1.2(b)(iii) and (iv)as follows:
SA D1.2 Number of exits required
(b)
Class 2 to 8 buildings—In addition to any horizontal exit, not less than 2 exits must be provided…
/resources/videos/sptc-referencing-system
NCC 2022 comes with some important changes to its structure and format. This short animated video show's what to expect with the code’s new referencing system 'SPTC' (Section - Part - Type - Clause).
/editions/2019/ncc-2019-volume-one/south-australia/section-d-access-and-egress
Vary D1.2(b) by adding SA D1.2(b)(iii) and (iv)as follows:
SA D1.2 Number of exits required
(b)
Class 2 to 8 buildings—In addition to any horizontal exit, not less than 2 exits must be provided from the following:
(iii)
a storage shed in a…
/news/2022/time-running-out-register-our-2022-ncc-seminars-volumes-one-and-two
This is an important event for you to learn about what has changed, and what it means to you and your industry.
/news/2022/registration-open-2022-ncc-seminars-volumes-one-and-two
Please join us in your capital city as we present the key changes for NCC 2022 Volume One and Volume Two.
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/specification-e22a-smoke
1. Scope
This Specification describes the installation and operation of automatic smoke detection and alarm systems.
Intent
To state that relates to the installation and operation of automatic alarm systems.
Automatic smoke detection and…
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/specification-e22a-smoke
1. Scope
This Specification describes the installation and operation of automatic smoke detection and alarm systems.
Intent
To state that relates to the installation and operation of automatic alarm systems.
Automatic smoke detection and…
/editions/2016-a1/ncc-2016-volume-two/part-32-footings-and-slabs/part-325-footing-and-slab
Explanatory information
Explanatory information:
The footings included in this Part reflect the requirements of AS 2870 and apply to the most common types of soil conditions. If the soil conditions on site are not covered by this Part then…
/editions/2016/ncc-2016-volume-two/part-32-footings-and-slabs/part-325-footing-and-slab-construction
Explanatory information
Explanatory information:
The footings included in this Part reflect the requirements of AS 2870 and apply to the most common types of soil conditions. If the soil conditions on site are not covered by this Part then…
/ncc-navigator/thermal-bridging-commercial-buildings
This NCC Navigator provides an introduction to thermal bridging and how the NCC addresses it for commercial buildings in NCC Volume One. It explains how to account for thermal bridges when calculating the Total R-Value of certain construction types.…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-38-health-and-amenity/part-386-sound
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative sound…
/editions/2019/ncc-2019-volume-two/part-38-health-and-amenity/part-386-sound-insulation
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative sound insulation system is proposed as a Performance Solution to that described in Part 3.8.6, that proposal must comply with—…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-f-health-and-amenity/part-f1-damp-and
Performance Requirements
FP1.1 Managing rainwater impact on adjoining properties
Surface water, resulting from a storm having an average recurrence interval of 20 years and which is collected or concentrated by a building or sitework, must be…
/editions/2019/ncc-2019-volume-one/section-f-health-and-amenity/part-f1-damp-and-weatherproofing
Performance Requirements
FP1.1 Managing rainwater impact on adjoining properties
Surface water, resulting from a storm having an average recurrence interval of 20 years and which is collected or concentrated by a building or sitework, must be…
/editions/2019/ncc-2019-volume-one/section-j-energy-efficiency/part-j5-air-conditioning-and
J5.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with—
(i)
J0.1 to J0.5; and
(ii)
J1.1 to J1.6; and
(iii)
J3.1 to J3.7; and…