Provides guidance to use the ABCB Standard for buildings in flood hazard areas.
Provides an understanding of the provisions in the ABCB Standard for Construction of Buildings in Flood Hazard Areas. Offers additional advisory information outside the scope of the Standard. This handbook should be read in conjunction with the ABCB…
Shows the performance-based design process for a house in a flood hazard area. It is recommended to read in conjunction with the Developing a Performance Solution process document.
The Bushfire Verification Methods handbook assists in understanding the Verification Methods for building in bushfire prone areas in NCC Volume One and Volume Two.
This discussion paper was released in April 2014, it informed and sought feedback from stakeholders on the resilience of new buildings to extreme weather events. The feedback helped to inform the ABCB on strategic advice it provided to governments in…
The National Model Code of Conduct for Building Surveyors sets out minimum obligations for registered building surveyors undertaking statutory functions. It covers four areas:
1. Comply with the law and act in the public interest
2.…
This Regulation Impact Statement (RIS) was prepared to incorporate the proposed amendments to the Australian Standard AS 3959-1999 Construction of buildings in bushfire prone areas (the Standard), which is referenced by the BCA for the protection of…
Previously, the ABCB discussed preparing technical files for the WaterMark Certification Scheme through a series of articles in ABCB Connect. In this next instalment, let’s look at product risk assessments.
Regulation Impact Statement for decision In November 2018, the ABCB agreed to implement changes to the NCC to improve energy efficiency in commercial buildings. These amendments to Section J of the NCC will be available to preview from February 2019…
Regulation Impact Statement for decision In November 2018, the ABCB agreed to implement changes to the NCC to improve energy efficiency in commercial buildings. These amendments to Section J of the NCC will be available to preview from February 2019…
Regulation Impact Statement for decision In November, the ABCB agreed to amend the NCC to require the construction of separate accessible adult change facilities (AACF) in public buildings including shopping centres and other public assembly buildings…