/editions/2016/ncc-2016-volume-two/section-1-general-requirements/part-14-documents-adopted
1.4.1 Schedule of referenced documents
The documents listed in Table 1.4.1 are referred to in the Housing Provisions.
Table 1.4.1: SCHEDULE OF REFERENCED DOCUMENTS
No
Date
Title
BCA Clause(s)
AS/NZS 1170
Structural design actions…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/part-c3-protection
C3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsCP1 to CP9 are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14 and C3.1 to C3.17; and
(ii)
in a building…
/editions/2016-a1/ncc-2016-volume-one/section-c-fire-resistance/part-c3-protection-openings
C3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14andC3.1toC3.17; and
(ii)
in a building containing an…
/editions/2016/ncc-2016-volume-one/section-c-fire-resistance/part-c3-protection-openings
C3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
C1.1 to C1.13, C2.1 to C2.14andC3.1toC3.17; and
(ii)
in a building containing an…
/editions/2019/ncc-2019-volume-one/section-c-fire-resistance/part-c3-protection-openings
C3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsCP1 to CP9 are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14 and C3.1 to C3.17; and
(ii)
in a building…
New plumbing only webinars added – NCC Public Comment Draft Roadshows
/news/2024/new-plumbing-only-webinars-added-ncc-public-comment-draft-roadshows
The Australian Building Codes Board (ABCB) is…These events are free to attend, however spots…
/news/2022/final-months-purchase-and-complete-ncc-2019-cpd-courses
As we move towards NCC 2022, our NCC 2019 online courses will no longer be available for purchase after 31 August 2022.
/ncc-cpd-micromodules
The ABCB is pleased to provide you access to our NCC continuing professional development (CPD) micromodules.
Public record: Board Meeting 2024 - 1
/public-record-board-meeting-2024-1-0
The aim of this Public Record is to share information about the matters being considered at each Board meeting. Some matters need to remain confidential due to specific confidentiality requirements or being part of a government/ministerial decision…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/part-c2-compartmentation
C2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsCP1 to CP9 are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14 and C3.1 to C3.17; and
(ii)
in a building…
/editions/2019/ncc-2019-volume-one/section-c-fire-resistance/part-c2-compartmentation-and-separation
C2.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsCP1 to CP9 are satisfied by complying with—
(i)
C1.1 to C1.14, C2.1 to C2.14 and C3.1 to C3.17; and
(ii)
in a building…
/editions/2016/ncc-2016-volume-two/part-312-energy-efficiency/part-3122-external-glazing
3.12.2 Application
This Part applies to—
(a)
a Class 1 building; and
(b)
a Class 10a building with a conditioned space.
3.12.2.1 External glazing
(a)
The aggregate conductance of the glazing in each storey, including any…
/editions/2016-a1/ncc-2016-volume-two/part-312-energy-efficiency/part-3122-external-glazing
3.12.2 Application
This Part applies to—
(a)
a Class 1 building; and
(b)
a Class 10a building with a conditioned space.
3.12.2.1 External glazing
(a)
The aggregate conductance of the glazing in each storey, including any…
Schedule of Excluded Products
/certification/schedule-excluded-products
The Australian Building Codes Board maintains a list of plumbing and drainage products that are excluded from the WaterMark Certification Scheme.
/editions/2016-a1/ncc-2016-volume-two/section-2-performance-provisions/part-22-damp-and
VERIFICATION METHODS
V2.2.1 Weatherproofing
(a)
Compliance with for the weatherproofing of an external wall that—
(i)
has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table V2.2.1a; and…
/editions/2016/ncc-2016-volume-two/section-2-performance-provisions/part-22-damp-and-weatherproofing
VERIFICATION METHODS
V2.2.1 Weatherproofing
(a)
Compliance with for the weatherproofing of an external wall that—
(i)
has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table V2.2.1a; and…
/resources/videos/vertical-separation-openings-external-walls
Type A buildings require protection for vertically separated openings in external walls. This video steps through NCC requirements found in C2.6.
/editions/2016-a1/ncc-2016-volume-one/section-f-health-and-amenity/part-f1-damp-and-weatherproofing
VERIFICATION METHODS
FV1 Weatherproofing
(a)
Compliance with for weatherproofing of an external wall— that
(i)
has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table FV1.1; and
(ii…
/editions/2016/ncc-2016-volume-one/section-f-health-and-amenity/part-f1-damp-and-weatherproofing
VERIFICATION METHODS
FV1 Weatherproofing
(a)
Compliance with for weatherproofing of an external wall— that
(i)
has a risk score of 20 or less, when the sum of all risk factor scores are determined in accordance with Table FV1.1; and
(ii…
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-32-footings-and-slabs/part-325-footing-and
Explanatory information:
Explanatory information:
The footings included in this Part reflect the requirements of AS 2870 and apply to the most common types of soil conditions. If the soil conditions on site are not…