/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/part-j3-building-sealing
J3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsJP1 and JP3 are satisfied by complying with—
(i)
J0.1
to J0.3; and
(ii)
J1.1
to J1.6; and
(iii)
J2.1
to J2.5; and…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-c-fire-resistance/specification-c34-fire
1. Scope
This Specification sets out requirements for the construction of fire doors, smoke doors, fire windows and fire shutters.
Intent
To prescribe standards for the construction of fire doors, smoke doors, fire windows and fire shutters…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-j-energy-efficiency/part-j3-building
J3.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementJP1 is satisfied by complying with—
(i)
J0.1 to J0.5; and
(ii)
J1.1 to J1.6; and
(iii)
J3.1 to J3.7; and…
/editions/2019/ncc-2019-volume-one/section-c-fire-resistance/specification-c34-fire-doors-smoke
1. Scope
This Specification sets out requirements for the construction of fire doors, smoke doors, fire windows and fire shutters.
Intent
To prescribe standards for the construction of fire doors, smoke doors, fire windows and fire shutters…
Designing for childcare in high rise buildings
/news/2018/designing-childcare-high-rise-buildings
The increasing demand for childcare coupled with long working hours for parents are giving rise to the need for CBD based childcare.
/editions/2019-a1/ncc-2019-volume-two-amendment-1/part-38-health-and-amenity/part-386-sound
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative sound…
/editions/2019/ncc-2019-volume-two/part-38-health-and-amenity/part-386-sound-insulation
Appropriate Performance Requirements
Appropriate
Performance Requirements
Where an alternative sound insulation system is proposed as a Performance Solution to that described in Part 3.8.6, that proposal must comply with—…
/editions/2016-a1/ncc-2016-volume-one/section-b-structure/specification-b12-design-buildings
1. Scope
This specification contains requirements for the design of buildings in cyclonic areas in addition to the requirements of AS/NZS 1170.2.
For the purposes of Specification B1.2, cyclonic areas are those determined as being located in wind…
/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/part-j8-facilities-energy
J8.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsJP1 and JP3 are satisfied by complying with—
(i)
J0.1
to J0.3; and
(ii)
J1.1
to J1.6; and
(iii)
J2.1
to J2.5; and…
/editions/2016/ncc-2016-volume-one/section-b-structure/specification-b12-design-buildings-cyclonic
1. Scope
This specification contains requirements for the design of buildings in cyclonic areas in addition to the requirements of AS/NZS 1170.2.
For the purposes of Specification B1.2, cyclonic areas are those determined as being located in wind…
/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/part-j8-facilities-energy-monitoring
J8.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsJP1 and JP3 are satisfied by complying with—
(i)
J0.1
to J0.3; and
(ii)
J1.1
to J1.6; and
(iii)
J2.1
to J2.5; and…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-b-structure/specification-b12-design
1. Scope
This specification contains requirements for the design of buildings in cyclonic areas in addition to the requirements of AS/NZS 1170.2.
For the purposes of Specification B1.2, cyclonic areas are those determined as being located in wind…
/editions/2019/ncc-2019-volume-one/section-b-structure/specification-b12-design-buildings-cyclonic
1. Scope
This specification contains requirements for the design of buildings in cyclonic areas in addition to the requirements of AS/NZS 1170.2.
For the purposes of Specification B1.2, cyclonic areas are those determined as being located in wind…
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/specification-a11-fire-protected
1. Scope
This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded.
Intent
To set out the requirements…
/editions/2016/ncc-2016-volume-one/section-general-requirements/specification-a11-fire-protected
1. Scope
This Specification contains requirements for fire-protected timber and procedures for determining the time at which the temperature at the interface between the protection system and the timber is exceeded.
Intent
To set out the requirements…
April CEO update - Gary Rake
/news/2024/april-ceo-update-gary-rake
/news/2020/ncc-2022-new-sptc-referencing-system
Here’s what to expect with the code’s new referencing system, dubbed SPTC: ‘Section - Part - Type - Clause’.
Report Cost implications of proposals to amend DTS Provisions
/resource/report/report-cost-implications-proposals-amend-dts-provisions
This report provides commentary on the cost implications of a range of proposed Deemed-to-Satisfy provisions emanating from the Emergency Egress for all Occupants Project. This report was prepared for the ABCB by Rider Levett Bucknall (RLB) in order to…
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine-areas
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…